What are The precautions for Installing The Main Circuit Cable of The Air Compressor?
What are The precautions for Installing The Main Circuit Cable of The Air Compressor?
...

What are The precautions for Installing The Main Circuit Cable of The Air Compressor?

Nov 27, 2019
Share:

1. Please refer to the instruction manual for the cable configuration of the low voltage power supply.
2. The standard fuse and the isolation air switch must be installed on the incoming line of the low-voltage power supply. The fuse and the isolating switch should be installed close to the air compressor, easy to access and control.
3. High-voltage cables should be designed and installed according to national standards according to qualified design units.
4. The high voltage motor housing must be grounded with a separate ground wire.
5. The cable should not be installed with too much stress to avoid short circuit caused by loose cables in the future.
6. The cable should not be in contact with the metal quick port to avoid short circuit caused by the cable being cut later.


About Elang:


Product Recommendation:

  • Working pressure: 7~13bar 100~190psig Air delivery: 2.5~102m3/min 88~3600cfm Working power: 22~560kw 30~750hp
    direct driven
  • Working pressure: 7~13bar 100~190psig Air delivery: 0.7~3.8m3/min 25~134cfm Working power: 7.5~22kw 10~30hp
    combined
  • Working pressure: 6.5~13bar 95~190psig Air delivery: 0.5~102.0m3/min 17.7~3600cfm Working power: 5.5~560kw 7.5~750hp Frequency range: 40%~100%
    VSD
  • Working pressure: 6.5~13bar 95~190psig Air delivery: 0.5~102.0m3/min 17.7~3600cfm Working power: 5.5~560kw 7.5~750hp Frequency range: 40%~100%
    PM
  • Working pressure: 4.0~13bar 58~189psig Air delivery: 9.5~61.9m3/min 335.5~2189cfm Working power: 55~315kw 75~420hp
    two-stage
  • Working pressure: 7~35bar 100~508psig Air delivery: 5.0~37.0m3/min 177~1310cfm Working power: 37~447kw 50~600hp
    portable

Company News:

Product Catalog